1、

new model of condenser for shipborne nuclear power unit and dynamic simulation

一种新型船舶核动力装置冷凝器模型与动态仿真方法

互联网摘选

2、

root cause analysis on 900 mw nuclear power unit primary coolant pump vibration problem

900MW核电机组主泵振动问题的根本原因分析

互联网摘选

3、

for achieving robust control of the nuclear island hvac system of cpr1000 nuclear power unit, the miniature plc is used.

为实现对CPR1000核电机组核岛通风系统的可靠控制,采用了小型PLC作为其控制器。

互联网摘选

4、

A real time model of simulation of secondary system for PWR nuclear power unit is presented.

介绍了核电机组二回路主蒸汽与给水回热系统实时仿真.

互联网摘选

5、

Analysis of the Discrepancies of Reactor Coolant Flowrate Measurement in Unit 2 of Ling'ao Nuclear Power Plant

岭澳核电站2号机组一回路流量测量偏差分析及处理

互联网摘选

6、

Unit 1 reactor [ Daya Bay Nuclear Power Plant]

第一组核子反应堆〔大亚湾核电厂〕

互联网摘选

7、

Analysis for Ling' ao Nuclear Power Station unit 1 exciter No.11 bearing white metal damage and its operating temperature abnormal high

岭澳核电站1号机组励磁机11号轴瓦乌金损坏及运行温度高的原因分析

互联网摘选

8、

The Control Management of Unit Status During The Containment Pressure Test in Daya Bay Nuclear Power Station

大亚湾核电站安全壳压力试验期间机组状态的控制与管理

互联网摘选

9、

Out of step protection for power unit in Guangdong Daya Bay nuclear power station

广东大亚湾核电站机组的失步保护

互联网摘选

10、

Aging Analysis of Reactor Pressure Vessel for Unit 2 of DAYA Bay Nuclear Power Station

大亚湾核电站2号机组反应堆压力容器老化现状的初步分析

互联网摘选

11、

In the analysis of main transformer phase B of unit 2 in Ling' ao Nuclear Power Station ( LNPS) by chromatography, acetylene was found. In order to carry out the inside check, the main transformer had been stopped and restored after necessary maintenances.

针对岭澳核电站2号主变压器B相油样色谱分析发现乙炔事件,将主变压器停运并进行了内部检查,在完成了必要的改进性维修后变压器恢复运行。

互联网摘选

12、

State Commissioning of Evaporator Unit of Boron Recycling System of Ling-ao Nuclear Power Plant

岭澳核电站硼回收系统蒸发器序列状态调试

互联网摘选

13、

state commissioning of gas stripper unit of boron recycling system of ling'ao nuclear power plant

岭澳核电站硼回收系统除气器序列状态调试

互联网摘选

14、

Toshiba is seeking to offload a big stake in its Westinghouse atomic power unit amid uncertainty over demand for nuclear reactors.

面对核反应堆需求前景的不确定性,东芝(toshiba)正设法出售其持有的西屋电气(westinghouse electric)核电部门大量股份。

互联网摘选

15、

Both the method of searching coil and RSO analysis are used to assess the short circuit process of Unit 2 generator rotor of Daya Bay Nuclear Power Plant. Brief discussion is made on the two analyzing methods.

本文利用气隙探测线圈和RSO两种测量方法,分析大亚湾核电站2发电机组转子绕组匝间短路的发生、发展以及最后的接地过程,并对匝间短路的检查分析方法进行了初步探讨。

互联网摘选

16、

The auxiliary power supply of Nuclear Power Station is used to supply the engineered safety features to ensure the safe shutdown of the reactor, when unit trip causes the house supply switch from Main Transformer to it.

核电站的辅助电源系统作为安全电源,在机组故障导致厂用电从主电网切换到辅助电源时向必须运行的专设安全设施供电,以保证反应堆安全停堆。

互联网摘选

17、

Reloading error took place at Dampierre nuclear power Station unit 4 in April 2001 in French, which lowered the sub-critical margin.

2001年4月,法国Dampierre4机组发生了燃料装载错误,导致次临界度降低。

互联网摘选

18、

Nuclear Safety Management and Control on Material Issue of Leak-tight Liner of Ling' ao Nuclear Power Plant Unit 3

岭澳3号机组核岛安全壳钢衬里材料变更问题的核安全监督管理

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈