discovering and describing product backlog items is an ongoing process.

  • 识别和描述产品待办事项列表中的待办项是一个持续的过程。
  • 来源:互联网摘选更新时间:2026-07-01 10:58:16

  • 重点词汇
  • ANabbr.Acid Number 酸值;
  • An[医]actinon锕射气;[地名] [缅甸] 安村;
  • ITEMSabbr.国家考试题库系统;
  • isvt.& vi. 是(be的三单形式);
  • backlogn.积压未办之事;没交付的订货;存货,储备;
  • discoveringv.发现( discover的现在分词 );碰见;撞见;了解到;
  • andconj. 和;与;而且;于是;然后
  • describingv.描写( describe的现在分词 );叙述;画出(图形等);形容;
  • Isn.英语字母表的第 9 个字母( I的名词复数 );[地名] [俄罗斯] 伊斯;
  • 相关例句
1、

again, this is another item on the product backlog.

同样,这是关于产品Backlog的另一术语。

互联网摘选

2、

during the sprint, the status of the work items in the sprint backlog is updated daily.

在冲刺期间,Sprint Backlog中工作项目的状态每日都会得到更新。

互联网摘选

3、

as items from the product backlog are selected for completion during the sprint planning meeting, they become part of a sprint backlog.

Product Backlog中的项目会在冲刺规划会议期间得到完成,它们成为积压冲刺的一部分。

互联网摘选

4、

in addition, it provides a single place for all scrum artifacts such as product backlog, sprint backlog, task management, retrospective, and reports with built-in context sensitive help.

另外,通过内嵌的上下文敏感帮助支持,它还为所有的Scrum工具提供一个独立的平台,如产品清单(Backlog)、Sprint清单、任务管理、回顾和报告等。

互联网摘选

5、

this can be a particularly convenient way to monitor the team workload when views other than the sprint backlog occupy the main editor window.

当不是Sprint Backlog的其他视图占据了主编辑器视图时,这种方式将会是监视团队工作负荷的方便方法。

互联网摘选

6、

the items in the sprint backlog are estimated in hours, allowing the team to determine if the items can be completed.

Sprint Backlog中的项目以小时进行估计,以便允许团队决定,项目是否能够准时完成。

互联网摘选

7、

the items in the sprint backlog are estimated in hours so that the team can determine whether the items can be completed in time.

代办冲刺中的项目通过小时来评价,这样团队才能明白该项目是否能够按时完成。

互联网摘选

8、

sprint backlog with tasks assigned to owners

Sprint Backlog与分配给所有者的任务

互联网摘选

9、

create a sprint backlog iteration plan

创建一个Sprint Backlog迭代方案

互联网摘选

10、

the sprint backlog represents the work that the team has committed to complete during the sprint.

代办冲刺代表了冲刺期间团队需要完成的工作。

互联网摘选

11、

any infrastructure tasks related to product backlog items were identified and included in the sprint backlog.

识别与产品待办事项相关的任意基础架构任务,并将之加入sprint待办事项。

互联网摘选

12、

in the wizard, enter sprint backlog for the name.

在向导中,输入Sprint Backlog的名字。

互联网摘选

13、

first, create a sprint backlog iteration plan.

首先,创建一个Sprint Backlog迭代方案。

互联网摘选

14、

major points to control the quality of zinc phosphatizing treatment by manual operation in full dip

手工操作浸渍式锌系磷化质量控制的几个要点

互联网摘选

15、

important bio-thermal physical problems and latest advancement in laser cell engineering.

激光细胞工程学中的重要生物热物理问题及其最新进展。

互联网摘选

16、

area, the phoenix girl, flying bell, powdered soup bridges a beautiful folklore same people forget.

景区内,凤凰姑娘、飞来钟、齑汤桥等一个个美丽的民间传说同样使人流连忘返。

互联网摘选

17、

only have the footmark leaving hardship on the snowfield, only meeting understands costful , lively lively feverishness.

只有雪地上留下艰辛的足迹,才会懂得活的珍贵,活的炙热。

互联网摘选

18、

The Prophylactic Effect of Hypertension Control of 1925 Patients in Capital Iron and Steel Plant

首钢1925名高血压病人防治效果分析

互联网摘选

19、

Comparison of the status in control of hypertension between rural and urban community health service centers in Beijing

北京市城乡社区卫生服务中心高血压防治现状的对比研究

互联网摘选

20、

Hypertension prevention, is no exception.

高血压防治上亦不例外。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈