1、

Presents a discussion on usual checking criteria of prediction model accuracy in forest practice and derives an index of relative critical error that has definite statistical sense by Freese's hypothetical test construction method.

本文对林业实践中常用的检验预测模型精度的指标进行了讨论,并从Freese提出的假设检验结构的方法中导出一个有明确统计意义的相对临界误差的指标。

互联网摘选

2、

A Computer-assisted Test Construction System for Reinforced Concrete Structure Design

混凝土结构计算机辅助测试系统

互联网摘选

3、

Through the rubble at home and abroad on the theory of technical analysis and test construction, made of stone technology and conditions of the old methods of investigation.

通过对国内外碎石化理论及试验施工技术分析,提出了碎石化技术的应用条件及老路调查方法。

互联网摘选

4、

Computer Test Construction is the basis of CBT, its key problem is to construct the test paper which satisfies the teaching and meets the teachers' demands, that means constraint optimization problems.

智能组卷是CBT的基础,组卷中关键是解决生成满足教学和教师要求的试题,即约束优化问题。

互联网摘选

5、

Specification is a crucial part of test construction. It is also the core product of this exploratory study.

考试规范是测试开发过程中的关键部分,也是本研究的核心成果之一。

互联网摘选

6、

A Monte Carlo study of the limitation of exploratory factor analysis in test construction

探索性因素分析在测验编制中局限性的模拟实验

互联网摘选

7、

A Study of Test Construction of Biology Integrative Paper on Integrative Abilities Test of Science

理科综合能力测试中的生物学综合试题命题研究

互联网摘选

8、

Sample test construction of mutant t-PA cDNA with both F and EGF domains deleted and its expression culture region

t-PA指形区、上皮生长因子样区缺失突变体cDNA克隆的构建及其在哺乳动物细胞中的表达

互联网摘选

9、

This article, using well-fitted Monte Carlo data produced by confirmatory factor analysis, intends to inspect the limitation of exploratory factory analysis in test construction.

本文主要用模拟研究的方法,通过生成拟合优度验证性因素分析的数据,来考察探索性因素分析在测验编制中的局限性。

互联网摘选

10、

This study combined Knowledge Space Theory and RSM for the first time in language test construction. I expect the findings will offer some new ideas and for language test construction in the future.

本研究是知识空间理论和规则空间模型的结合在语言测验编制中的首次运用,笔者期待研究结果能为今后语言能力测验的编制提供新的思路和一定的经验。

互联网摘选

11、

As a new tendency of measure theory, cognitive diagnostic assessment ( CDA) emphasizes the role that cognitive psychology played in test construction.

认知诊断作为新-代的测量理论,强调认知心理学对测验编制的指导作用。

互联网摘选

12、

Therefore, investigating problem categories and structures not only contributes to teaching and learning, but also lays a scientific foundation for mathematical curriculum design and test construction.

研究应用题的类型、结构不仅对学生学习,教师教学有帮助,也有助于数学课程的设计与测验题目编制的科学化。

互联网摘选

13、

Application of controllable explode technology to the subway test construction in Qingdao City

控制爆破技术在青岛地铁试验段施工中的应用

互联网摘选

14、

The conventional quality control method of earth-rock dam construction is mainly based on test pits sampling. This method is difficult to meet the demands of high intensity and high mechanization of large-scale dam construction because of man-made interference and extensive management.

常规土石坝施工质量控制主要是以单元验收时的试坑检测结果为判断依据,人为因素干扰大,管理粗放,难以满足以高强度、高机械化为特点的大型土石坝工程施工的要求。

互联网摘选

15、

This structural design is applied to real engineering. The construction technology and working results of fiber-reinforced concrete road are discussed by laying test road in order to promote the application of fiber-reinforced concrete.

把此结构设计应用于工程实际,并结合试验路的铺筑,探讨了钢纤维混凝土路面的施工工艺及路用效果,以促进钢纤维混凝土的推广应用。

互联网摘选

16、

It realizes high-accuracy test of angle position and real-time control, and satisfies the needs of some fields for high-accuracy and high resolution absolute photoelectric rotary encoders, such as snare science automation and national defense construction, etc.

因此可实现角位置的高精度检测与实时控制,从而满足空间科学、自动化和国防建设等领域对高精度、高分辨率绝对式光电轴角编码器的需要。

互联网摘选

17、

Based on ATB Test Road paving, the paper studied on the effect of different construction techniques on paving quality, and recommends reasonable construction process and quality control standard.

在铺筑沥青稳定碎石基层试验路的基础上,研究不同施工工艺对施工质量的影响,推荐了合理的沥青稳定碎石基层施工工艺和质量控制指标。

互联网摘选

18、

The constructed test road solved the problem of construction process in hot and sticky South China and provided the support to development of the flexible base asphalt pavement.

试验路的铺筑成功的解决了中南湿热地区级配碎石施工工艺问题,为今后的柔性基层推广使用提供支持。

互联网摘选

19、

Guiyang Institute uses geophysical detection method to detect the construction quality of anchor pole in a hydroelectric engineering, that is determined by known anchor pole test, unknown anchor pole check-out to qualified practical engineering anchor pole check-out.

贵阳勘测设计院工程物探测试分院利用物探检测方法对某水电站工程锚杆施工质量进行检测,是通过已知模拟锚杆测试、未知模拟锚杆考核到实际工程锚杆考核合格后确定的。

互联网摘选

20、

Test observation data of the FSQ tiltmeter at Sunan station are analyzed, and it is found that the construction of a tilt station is feasible in Sunan.

对肃南台FSQ自记水管倾斜仪试记资料进行了分析,对建台后几个月的资料进行了处理。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈