1、

Once the test connection is successful, click the Next button.

测试连接成功之后,单击Next按钮。

互联网摘选

2、

Test Connection-Use this button to test the connection to the database.

Test Connection&使用这个按钮测试数据库连接。

互联网摘选

3、

Click Test Connection to make sure that the connection works.

点击Test Connection确保连接工作正常。

互联网摘选

4、

An option to test the connection using the Test Connection button.

使用Test Connection按钮测试连接的选项。

互联网摘选

5、

Click Test Connection to see if a connection can be established.

单击Test Connection,看看连接是否建立了。

互联网摘选

6、

Now in the Test frame, click on the Test Connection button to test the JDBC connection with the DB2 database.

现在,在Test框架中,单击Test Connection按钮来测试与DB2数据库的JDBC连接。

互联网摘选

7、

Click Test Connection to verify if the connection has been made successfully.

单击Test Connection检查连接是否成功。

互联网摘选

8、

If the test connection works, click OK

如果测试连接工作,单击OK

互联网摘选

9、

Use a ray-reflecting instrument to realize bidirectional test of cable connection

用一台光时域反射仪实现光缆接续的双向监测

互联网摘选

10、

Simple alternation problem Can AC Single-phase Series Connection Supersede AC Three-phase Temperature Rise Test?

单次交替题单次交替题交流三相温升试验能用交流单相串联试验替代吗?

互联网摘选

11、

If you'd like to test your Internet connection, select the test button.

如果希望测试internet连接,请选择“测试”按钮。

provided by jukuu

12、

Test the connection using the Test button, and then save this new connection using the Save button from this dialog box.

在此对话框中,使用Test按钮测试连接,然后使用Save按钮保存这个新连接。

互联网摘选

13、

According to the completion test purposes, water depth and test formation features factors, optimize the types of test tools and connection of test tools, design the well test string structure.

根据完井测试目的、水深和测试地层特点等因素,优选测试工具类型和组合方式,设计完井测试管柱的结构。

互联网摘选

14、

Select the Test the connection button to test your connection.

选择Test the connection按钮测试连接。

互联网摘选

15、

But the connection of wind power makes the districts show a typical character of week feed system which forms a great test for system relay protection especially in high frequency protection of which one line can falsely trip two times.

但风电的接入使得该地区电网呈现出典型的弱馈系统特点,这使得系统继电保护面临很大的考验,尤其作为高频保护,现场曾发生过同一条线路两次误动的现象。

互联网摘选

16、

Click on the Test button to test the connection to the database and also to confirm the correctness of the Host Access configuration.

单击Test按钮测试到数据库的连接,并确认Host Access配置的正确性。

互联网摘选

17、

To confirm the connection settings before you save them, you can click the test button.

若要在保存连接设置之前确认设置是否正确,可以单击“测试”按钮。

provided by jukuu

18、

The result after temperature rise test indicated that such kind of bus-bar partial overlap technique was with high pressure large current carrying, low temperature rise and reliable connection etc advantages.

经温升试验结果表明,该种母线局部搭接技术具有压强高、载流大、温升低、连接可靠等优点。

互联网摘选

19、

Data communication is implemented for the terminal machine and test server through Client/ Server mode, the connection for the test server and client machine is implemented by using Browser/ Server mode.

前端机和测试服务器通过实时网络通讯Client/Server方式进行数据传输,测试服务器和客户机通过Browser/Server模式连接。

互联网摘选

20、

Can AC Single-phase Series Connection Supersede AC Three-phase Temperature Rise Test? We shall be able to give you a good account sale.

交流三相温升试验能用交流单相串联试验替代吗?相信我们可以向贵公司提交满意的销售帐单。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈