1、

The assembly shall include two resilient seated shutoff valves & four ball type test cocks.

这种总成应该包括两个弹性阀座关闭阀 和 四个球型测试旋塞.

网络文摘精选

2、

From the mold material processing, design, assembly, test mode full-service.

从模具材料加工 、 设计 、 装配 、 试模 全方位 服务.

互联网摘选

3、

At present, the machine layout problem of semiconductor assembly and test workshop is usually solved by entity model or layout assumption diagram with a little quantitative calculation which lack of scientific quantitative calculation, theory guiding and flexibility for the change of manufacturing.

目前,其车间设备布局问题通常通过建立实体模型或绘制大量布局方案图并辅以少量的定量计算来解决,这种方式缺少科学的定量分析和理论指导,并且对于车间生产变化的应对能力相对不足。

互联网摘选

4、

The assembly shall also include two resilient seated isolation valves, four top-mounted resilient seated test cocks and an air gap drain fitting.

这种总成应该包括两个弹性阀座隔离阀,四个顶部安装弹性阀座测试旋塞和一个气隙排放接头。

互联网摘选

5、

The assembly shall include two nickel-plated resilient seated isolation valves and four top mounted test cocks.

这种总成应该包括两个镀镍弹性阀座隔离阀和四个顶部安装测试旋塞.

互联网摘选

6、

It is mainly engaged in assembly and test of operating Pedestals, oil sources and front box components of steam turbine, gas turbine or wind power equipments etc.

主要从事汽轮机、燃机、风电等产品的:操纵座装配、试验;油源装配、试验;前箱部套装配、试验;

互联网摘选

7、

Implement IPQC and OQC on the assembly and test vendor.

按公司产品要求抽检封装及测试厂生产及发货质量.

互联网摘选

8、

For assembly and test factories, OEE ( Overall Equipment Effectiveness) is a key index to measure production management and financial cost.

对于封装测试工厂,设备综合效率是衡量生产管理水平和成本竞争力的重要指标。

互联网摘选

9、

NHR Dynamic Analysis of Control Rod and Fuel Assembly of Test Model

供热堆控制棒驱动线试验模型动力分析

互联网摘选

10、

An insulating attaches the assembly the structure under test and isolates the sensor from ground-referenced potentials.

绝缘胶粘合装置元件到待测结构上,使传感器与接地参考电位隔离.

互联网摘选

11、

the companys primary business is ic component packaging and test and memory module assembly.

公司的主要业务是集成电路封装测试和内存模块装配.

互联网摘选

12、

The final machine assembly and commissioning, technical indicators test concluded.

最后进行整机装配和调试,进行技术指标测试,得出结论。

互联网摘选

13、

stick out engine assembly and test specifications and cooperate with manufacture engineer to implement.

制定新发动机装配、试验技术条件并协助制造工程实施.

互联网摘选

14、

The quality requirement of raw materials, production technology specification requirement, equipment selection and assembly line, production process key control point requirement and test of products requirement had been confirmed.

确定了原材料质量标准、生产工艺技术参数、设备选型及流水线配套、生产过程关键控制点及产品检验标准。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈