1、

Empirical Study of Risk-sharing Mechanism in Large-scale Petrochemical EPC Turnkey Projects

大型石油化工EPC交钥匙项目风险分担机制实证研究

互联网摘选

2、

Therefore, how to ensure the accuracy of the buyback base price on risk-sharing basis and a reasonable return on investment is the key to success of BT project issues.

因此,如何在风险分担的基础上确保回购基价调整的准确性以及合理的投资回报率是BT项目顺利进行的关键问题。

互联网摘选

3、

The unreasonable risk-sharing mechanism between the insuer and the responsible parties of project is the root cause that the CQI is in the dilemma.

保险公司与各责任主体之间的风险分担不合理是导致该险种陷入困境的主要根源,因此在保险公司与各责任主体之间建立一个合理的风险分担机制是解决问题的关键。

互联网摘选

4、

the traditional thoughts of this issue are based on the principle of information content and optimal risk-sharing, but the contemporary view emphasizes interaction between the structure of corporate governance and the incentive effect of stock option.

传统的思路基于信息含量原则和最优风险分担,现代观点则强调公司治理结构与股票期权激励效果之间的互动关系。

互联网摘选

5、

in the reits and ppp financing model analysis, focusing on the mode of operation mechanism, and put forward according to the practical experience of the clear preferential taxation policy and to establish risk-sharing mechanism of the related conditions.

在REITs和PPP模式分析中,重点介绍了模式的运作机制,并根据实践经验分别提出了明确税收优惠政策和建立风险分担机制的相关配套条件。

互联网摘选

6、

Pooling of net cash flows and liability also has risk-sharing advantages.

共享净现金流和同意承担成员行动的责任也有风险承担上的优势.

互联网摘选

7、

This paper analyzes the problem of managers risk-sharing and incentive design in termination menace.

本文分析了解雇威胁条件下的经营者风险分担和激励设计问题.

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈