1、

Weaving section of ramp terminal is the critical section which influences efficiency of the whole off-ramp at urban elevated expressway. Capacity at weaving section determines capacity of the whole ramp.

匝道接地点前方交织区是影响城市高架道路下匝道通行效率的关键,其通行能力决定着整条匝道的通行能力。

互联网摘选

2、

The simulation results show that, this algorithm carries out avoid the traffic congestion in the condition of largest used the capacity of main line of freeway. It also avoid some vehicles queued for a long time in the entrance ramp.

仿真结果表明,该算法实现了在最大程度的利用高速路主线通行能力的情况下避免了交通堵塞,也避免了某些车辆在入口匝道上长期处于排队等待的情况。

互联网摘选

3、

On the Capacity Model for In-ramp Terminal of Elevated Road

高架道路上匝道通行能力理论模型研究

互联网摘选

4、

Capacity of weaving section at off-ramp terminal of elevated expressway

城市高架道路下匝道地面交织区通行能力

互联网摘选

5、

Due to the traits of nonlinear, capacity of study, self adapting and anti-interference, neural network is suitable for the control of ramp metering.

鉴于人工神经网络具有良好的非线性特性、学习能力、自适应能力和抗干扰能力,因此本文将人工神经网络技术引入到高速公路入口匝道控制中,对其进行研究。

互联网摘选

6、

The factory don't have that capacity to ramp up.

这家工厂没有能力加速生产。

互联网摘选

7、

research on highway capacity model of freeway on-ramp junction

高速公路入口匝道通行能力模型研究

互联网摘选

8、

empirical highway capacity model of on-ramp junction

高速公路上匝道合流区通行能力经验模型

互联网摘选

9、

The capacity of ramp-way junction controls the capacity of the ramp.

因此,匝 道连接 点的通行能力制约着匝道的通行能力.

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈