1、

Using Principles of System Engineering for the Rectification of Fire Main System

运用系统工程原理抓消防水系统整改

互联网摘选

2、

Based on the analysis, corresponding measures including retarding plate corrosion, improving scraper, fastening stand fire main, adding rust-resisting valve and auto-sewerage are introduced in detail.

提出了延缓罐底板腐蚀、改造刮板、固定消防立管、增设除渣阀、安装自动排水装置等具体改进措施。

互联网摘选

3、

All ships prepare to fire main guns.

所有战舰,主炮准备开火.

互联网摘选

4、

Fire main with fire valve

带消火阀的消防总管

互联网摘选

5、

Using principles of system engineering, to analyze six factors that affect the reaching of stable high pressure of fire main system, to draw up the fish-bone diagram, and rectification plans have been proposed.

运用系统工程原理,对影响消防水系统达到稳高压的6方面因素进行分析,画出鱼刺图,提出整改方案。

互联网摘选

6、

Causes for the phenomenon such as corrosion of base plate, wax on the wall, clogging of central drainpipe, falling of fire main due to corrosion, fire pipe blockage due to rust are analyzed.

对1985年投产的旧式浮顶油罐罐底板腐蚀、罐壁结蜡、中央排水管堵塞、消防立管腐蚀穿孔掉下、消防管线经常被锈渣堵塞产生的原因进行了分析。

互联网摘选

7、

Integrity of fire main system

消防总管系统完整性

互联网摘选

8、

Thermal radiation is the main method of heat transfer in a compartment fire.

热辐射是室内火灾中热传递的主要方式,并且决定着火灾的蔓延和发展。

互联网摘选

9、

According to the mechanisms of inter-building fire-spread, the latter sub-model formulates two main fire-spread ways, i.e. thermal radiation and thermal plume heating, respectively by simplifying and modifying pervious theory-based models. Additionally, it also quantifies the weather conditions which have great effect on inter-building fire-spread.

后者则是从建筑物间火灾蔓延的机理入手,借鉴已有模型对两种主要的火灾蔓延方式热辐射与热对流进行模型的简化和修正,并且量化了影响建筑物间火灾蔓延的气象条件。

互联网摘选

10、

The results show that the welded joint can rotate largely in fire and flexure of column flange and shear deformation are main factors causing the rotation of joint, furthermore, column stiffeners can increase the critical temperature of joint by about 50 ℃.

试验表明:焊接节点在火灾下有较大的转动能力,柱翼缘的弯曲变形和腹板的剪切变形是引起节点转动的主要因素,柱腹板加劲肋可提高节点临界温度50℃左右。

互联网摘选

11、

Aerial platform fire truck as a kind of aerial work equipment, its height is the main performance parameter.

登高平台消防车作为一种高空作业设备,作业高度是它的主要性能参数。

互联网摘选

12、

Doors of engine casing and stair casing on main deck are of fire doors with self-closing device.

主甲板机舱棚围壁和梯道环围等处安装的门为带闭门器的防火门。

互联网摘选

13、

Model 07-S should be installed at the fire sprinkler service connection to the main line.

型号07-S应该安装在连接到主管道的消防喷淋系统处。

互联网摘选

14、

In the thyristor valve for Three Gorges-Changzhou HVDC Project, each thyristor is provided with a thyristor control unit ( TCU). The main purpose of the TCU is to fire and monitor the thyristor.

三峡&常州高压直流输电的晶闸管换流阀中,每个晶闸管都有一块控制电子线路单元(TCU),其功能为控制并检测该晶闸管。

互联网摘选

15、
16、

Such systems included vertical exhaust main pipe, horizontal exhaust branch pipe, range hoods, the roof hood, fire-protection device and check valve.

这种系统包括竖向排气干管、横向排气支管、吸油烟机、防火及防串烟部件和屋顶风帽。

互联网摘选

17、

I think they've already put out the fire on Main Street.

我想他们应该已经扑灭了主街上的火吧。

互联网摘选

18、

The type of forest fuel and degree of fire danger were main factors to deter-mine the control area.

森林可燃物类型及火险等级是确定控制面积的主要因素;

互联网摘选

19、

Mr Hague said they stole personal possessions and set fire to the main embassy office building.

海格说,他们偷走了私人物品,还放火烧了使馆主办公大楼。

互联网摘选

20、

Finally, this thesis compares magnesium oxychloride straw wall to existing thermal insulation wall, showing straw walls can avoid fire, straw wall has same life with main structure, and further illustrates to popularize its feasibility and value in rural.

最后,对本文将氯氧镁秸秆墙材墙体与现行保温墙体进行比较,说明秸秆墙体不仅能消除火灾隐患,而且秸秆墙体能和主体结构同寿命,进一步说明其在农村推广的可行性和价值。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈