1、

During the construction of TSQ ⅰ CFRD, some problems including the separation of deck from the cushion on the top of phase ⅰ and phase ⅱ decks, cracking of the slope face of cushion and partial deck occurred.

在天生桥一级水电站混凝土面板堆石坝的施工中,发生了一、二期面板顶部脱空、上游垫层坡面开裂和面板局部裂缝问题。

互联网摘选

2、

The Construction of TSQ-1 Hydropower Project is Stepping on a New Stage

天生桥一级水电站工程建设一步上一个新台阶

互联网摘选

3、

Method TSQ fluorescence was used to detect free zinc ions in mouse lungs.

方法应用TSQ荧光技术检测小鼠肺组织内的锌离子。

互联网摘选

4、

High slope design in the power house area of TSQ ──ⅰ Hydropower Project

天生桥一级水电站厂区高边坡设计

互联网摘选

5、

Presentation on the primary circuit design in the bidding design stage for TSQ-ⅰ Hydropower Project

天生桥一级水电站招标设计阶段电工一次设计介绍

互联网摘选

6、

The Fault Analysis and Improvement Suggestion on DC Filter Capacitor at Converter Station of TSQ

天生桥换流站直流滤波电容器故障原因分析及改进建议

互联网摘选

7、

Analysis of Settlement Payment of Lot C_3 for TSQ-ⅰ Hydropower Station

天生桥一级水电站C3标工程结算支付分析

互联网摘选

8、

River water flow control and construction program planning of concrete-face rock fill dam for TSQ-ⅰ Hydropower Project

天生桥一级水电站河道水流控制与面板堆石坝施工程序规划

互联网摘选

9、

The Role of Consulting Services in the Construction of TSQ-1 Project

咨询活动在天生桥一级水电站建设中发挥的作用

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈