Plotting and implementation of the unified gnps-lnps on-site emergency planning& Preparedness

  • 大亚湾和岭澳核电站统一场内应急计划与准备的策划和实施
  • 来源:互联网摘选更新时间:2026-07-14 05:05:52

  • 重点词汇
  • ofprep. 关于;属于…的;由…制成;
  • andconj. 和;与;而且;于是;然后
  • preparednessn.有准备,已准备;
  • AND与(计算机逻辑运算的一种,或称逻辑乘法) AND gate “与”门(电路,脉冲);
  • unifiedadj.(unify 的过去式和过去分词);统一的;统一标准的;一元化的;
  • on-siteadj.&adv.现场的;[化] 场区内,在工地上,就地;
  • plottingn.测绘,标图;
  • implementationn.(新政策的)实施;
  • 相关例句
1、
2、

Study on Core Power Capability during Stretch-Out for Ling' ao Nuclear Power Station

岭澳核电站延伸运行工况下的功率能力分析

互联网摘选

3、

Quality management for big equipment lifting at Lingao nuclear power station

岭澳核电站大件设备吊装质量管理

互联网摘选

4、

Design Optimizations for Conventional Island for Ling'Ao Phase II Nuclear Power Plant

岭澳核电站二期工程常规岛主厂房布置设计优化

互联网摘选

5、

Construction Technology of Safety Shell Prestress in Ling'ao Nuclear Power Station Phase ⅱ

核发电站,原子能发电站岭澳核电站二期核岛安全壳预应力施工技术

互联网摘选

6、

Concrete Strength Control in Construction of Ling'ao Nuclear Power Station

岭澳核电站建设中混凝土强度控制

互联网摘选

7、

Electrical Protection System for 2 × 1 000 MW Units in Lingao Nuclear Power Station

岭澳核电站2×1000MW机组电气保护系统

互联网摘选

8、

Changing and Locating the Site of the Ling'ao Nuclear Power Station

岭澳核电站厂址转移和定位

互联网摘选

9、

The Installation of Safety Valve of Nuclear Island Stabilizer in Ling'ao Nuclear Station

岭澳核电站核岛稳压器安全阀的安装

互联网摘选

10、

With morphology observation and chemical composition analyses by SEM and EDS as well as immersion test and corrosion potential measurement, the corrosion of debris filters in the CRF system of Ling Ao Nuclear Power Station was studied. The primary cause was regarded as microbion induced corrosion.

通过形貌观察、化学成分分析、扫描电镜及能谱分析、浸泡试验、自腐蚀电位测定,研究了岭澳核电站CRF系统碎石过滤器的腐蚀现象,其主要原因被归结为微生物腐蚀的作用。

互联网摘选

11、

State Commissioning of Evaporator Unit of Boron Recycling System of Ling-ao Nuclear Power Plant

岭澳核电站硼回收系统蒸发器序列状态调试

互联网摘选

12、

Application of Plastic Concrete Anti-seepage Wall in Breakwater of Lingao Nuclear Power Station

塑性混凝土防渗墙在岭澳核电站防波堤的应用

互联网摘选

13、

The Control and Improvement of FAC in LingAo II Feedwater Pipe Work

岭澳核电站二期给水管道流动加速腐蚀的控制与改进

互联网摘选

14、
15、

I& C System Analysis for Demineralisation water plant of Ling Ao Nuclear Power Station

岭澳核电站除盐水车间的控制系统分析

互联网摘选

16、

Along with the series of new policy supporting nuclear power and nuclear industries, it is urgent to improve the existing radiation monitoring network. However, traditional network monitoring has certain disadvantages, such as difficult wiring, high maintenance cost, and high operating cost.

随着国家一系列扶持核电与核工业的新政的出台,现有辐射环境监测网亟待改进。传统的监测点组网及数据传输都有布线难,维护成本高,运行费用高等缺点。

互联网摘选

17、

At present, China is expanding nuclear power in a large way. The process of. localization of nuclear power equipment is so imperative that nuclear power equipment companies face both a challenge and a rare opportunity of development.

当前国家大规模发展核电,核电装备国产化势在必行,这对核电装备企业来说既是一种挑战,又是一个难得的发展契机。

互联网摘选

18、

Though some countries including India, China, the US and France, already plan new plants, and others such as the UK are considering new reactors, others oppose any new capacity, including Germany and Spain.

尽管包括印度、中国、美国和法国在内的一些国家已经计划建立新的核电站,英国等一些国家也在考虑建立新的反应堆,但德国和西班牙等其它一些国家反对增加核电产能。

互联网摘选

19、

Elsewhere, countries that fear foreign control of their energy supply tend to be pro-nuclear.

其它地方,那些担心外国控制能源供应的国家也往往倾向核电。

互联网摘选

20、

Based on the national key nuclear power project, this paper introduces the structure, manufacturing, installation and commissioning of the seawater circulating pump, which has provided foundation for the localization design and manufacturing.

本论文作者依托国家重点核电项目对海水循环泵结构、制造及安装调试方面的内容进行了详细阐述,为今后海水循环泵国产化提供设计制造依据。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈