Thinking of youth volunteers developing sanitation support in the needy region

  • 对青年志愿者开展农村卫生扶贫的思考
  • 来源:互联网摘选更新时间:2026-07-01 10:55:54

  • 重点词汇
  • thinkingn.思考;想法,思想;意见;见解;
  • theart.这个;指已提到或易领会到的人或事物;指独一无二的、正常的或不言而喻的人或事物;用以泛指;与形容词连用,指事物或统称的人;用于姓氏的复数形式前,指家庭或夫妇;(指特定用途的事物)足够,恰好;每,一;当前的,本,此;(重读,表示所指的为知名或重要的人或事物)
  • volunteersn.义务工作者( volunteer的名词复数 );志愿者;自告奋勇者;主动做某事的人;
  • youthn.青(少)年时期;青年;青春;年轻;朝气;小伙子;(统称)年轻人;青年男子;
  • needyadj.贫穷的;贫困的;
  • sanitationn.卫生系统或设备;
  • ofprep. 关于;属于…的;由…制成;
  • regionn.地区,行政区域;(首都以外的)各地区;身体部位;
  • 相关例句
1、

To study the differences of the GPIb polymorphism patterns between the Ewenki and Daur nationalities, Platelet samples were obtained from 169 healthy young Chinese volunteers, 84 Ewenki and 85 Daur;

研究旨在进一步探索同一人种的不同民族之间GPIb的多态性是否存在差异。血小板从84名健康鄂温克族、85名达斡尔族青年志愿者采血分离而获得。

互联网摘选

2、

Methods: Forty-eight young healthy volunteers were investigated in this study. 24-hour intragastric pH and bile reflux monitoring were performed with ambulatory bilirubin monitor ( Bilitec 2000) and pH monitor synchronously.

方法:应用Bilitec2000便携式胆红素监测仪和pH监测仪同步监测48名健康青年志愿者的24h胃内pH和胆汁反流情况。

互联网摘选

3、

Sensitivity Analysis of Incomplete Split-Phase Transverse Differential Protection for Three Gorge Power Station

三峡电站不完全裂相横差保护的灵敏度分析

互联网摘选

4、

Research on the Rigidity/ Strength of Hydroelectric set for Three Gorges Project

三峡电站水电机组刚强度研究

互联网摘选

5、

Calculation and Machining for Installation of Hydro Turbine Water Distributor

三峡电站水轮机导水机构安装的计算和加工处理

互联网摘选

6、

Economic evaluation of main electrical connection schemes of Sanxia hydroelectric power station

三峡电站电气主接线及接入系统的经济性评价

互联网摘选

7、

Analysis on Deflection of Main Girders for 1200t/ 125t Bridge Cranes

三峡电站左厂1200t/125t桥机主梁挠度分析

互联网摘选

8、

Systematic analysis of the substation scheme of large power plants

大型电站主接线的系统分析&智能模拟法在三峡电站主接线系统分析中的应用

互联网摘选

9、

Analysis of regulating peak capacity to Three Gorges Hydropower Plant

三峡电站调峰能力分析

互联网摘选

10、

Economy risk analysis of installed capacity expansion at Three Gorges power plant

三峡电站装机容量扩充的经济合理性与风险分析研究

互联网摘选

11、

Water pressure test technique of expansion joint for Three Gorges Hydropower Station

三峡电站伸缩节制造水压试验技术

互联网摘选

12、

The characteristics of imported water turbines used in Three Gorge power station

三峡电站引进机组水轮机的性能特点

互联网摘选

13、

Issues of the Step up Transformers for Three Gorges Power Plant

三峡电站升压变压器的若干问题

互联网摘选

14、

Parameter selection of water turbine generator for Three Gorges Power Station

三峡电站水轮发电机参数选择

互联网摘选

15、

Study on the Casting Process of the Three Gorges Turbine Blade

三峡电站水轮机叶片的铸造工艺研究

互联网摘选

16、

Influences of Daily Regulation of the Three-Gorges Power Station on Navigation

三峡电站日调节对航运的影响

互联网摘选

17、

Regulation of Vertical Clearance of Three George Hydraulic Turbine Guide Vanes

三峡电站左岸机组水轮机导叶立面间隙的调整与处理

互联网摘选

18、

Application of Intelligent Ticket System in Plants of Three Gorges Cascade

三峡电站电气倒闸智能操作票系统

互联网摘选

19、

In reference [ 2] the grounding mesh model for Three Gorges Hydroelectric Station is calculated and the conclusion is that under a certain condition of technology and economy it is possible to reduce the grounding resistance of the power station to 0.15W or lower.

文献[2]对三峡电站的模型地网进行了计算,认为在一定的技术经济条件下,将三峡电站的接地电阻降低至0.15W及以下是可能的。

互联网摘选

20、

The pulsating pressure data measured in draft tube of hydro-turbine model test for the Three Gorges Power Station working under 73 m water head are utilized to generate the pulsating pressure field in the whole flow passage.

本文利用三峡电站73m水头水轮机模型试验中脉动压力的实测数据,构造出整个流道内脉动压力场,求出了厂房结构在各种振源联合作用下的动力响应。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈