1、

Study on Cost Benefit Assessment of Environmental Impact of Traffic Construction Project

交通建设工程环境影响的经济损益评价研究

互联网摘选

2、

Time and Cost Dynamic Management of Communication Engineering Project

通信工程项目进度与费用的动态管理

互联网摘选

3、

Cost study of heat supply and electricity supply of cogeneration project

热电联产项目供热、供电成本分摊机制的研究

互联网摘选

4、

The light steel form jack plane manufactured by themselves has been used in pouring of the lining concrete, which not only improves the quality and progress of the project, but also decreases the cost.

在衬砌混凝土浇筑时由于采用自行加工的轻型钢模台车,不仅提高了工程质量和进度,而且降低了成本。

互联网摘选

5、

The paper briefly introduces the selection principles and design scheme of the technical parameters, furnace structure, flue gas treatment, area, equipment, environmental protection, project investment and operation cost of a municipal solid waste incineration plant.

本文章简要介绍了城市生活垃圾焚烧厂工艺参数、炉型结构、烟气处理、用地面积、设备配置、环境保护、工程投资和运行成本等内容的选择原则和设计方案。

互联网摘选

6、

A cost optimization model for production scheduling is built, which is a multi-mode project scheduling problem subject to the constraints of time, renewable resources and nonrenewable resources.

建立了一种车间层的生产计划的成本优化模型,该模型是一个在时间约束、可重复使用和不可重复使用资源约束下的多模式项目调度问题;

互联网摘选

7、

Estimation of Benefit-Cost of the First Stage Project of Water Diversion from the South to the North via the West ern Course

南水北调西线第一期工程经济效益分析和调水成本初步测算

互联网摘选

8、

Cost Control of Lump Sum Turn Key Contract of Petrochemical Project Mainly Engaged in Engineering Design

浅谈以设计为主体石油化工总承包项目的费用控制

互联网摘选

9、

In the past study focused on the qualitative relationship between duration and direct cost of the project.

以往针对工程项目多目标优化问题的文献大多是研究项目工期和项目直接成本之间的定性关系。

互联网摘选

10、

It plan, register, audit, analysis and control the data of project manpower activity hours, equipment activity hours and direct cost.

对于项目的人员作业工时、设备作业工时和直接费用借助信息化系统进行计划、登记、审核、分析和控制管理工作,细化了项目成本管理的目标。

互联网摘选

11、

Making use of the relations among the direct cost, the indirect cost and the total cost, we get the best time limit for the project with results of the optimal T-C decision-making.

利用直接费用、间接费用与总费用的关系,预测出总费用最低时对应的工期,从而给出了工期一费用的最优决策。

互联网摘选

12、

Meantime, optimize the whole project by control many detail, finally get the purpose of decrease production cost, control product quality, increase manufacture capacity, decrease delivery cycle time.

对此项目的优化主要以降低生产成本为目的,同时通过对众多细节的控制达到对项目整体的优化,最终达到降低生产成本,控制产品质量,提高生产产能,缩短供货周期等目的。

互联网摘选

13、

This paper then expounds the specific strategy and procedures of the exploration market of Qinghai Oilfield effectuating the complete Project Management, and analyzes the reasons of the high cost of exploration, presents the corresponding methods.

阐述了青海油田勘探市场实施完全项目管理的具体策略和步骤,并对勘探成本居高不下的原因做出了分析,提出了相应的解决办法;

互联网摘选

14、

Philosophy and method of "full cost project management basing on suppositional production value"

“虚拟产值全成本项目管理”的思路与做法

provided by jukuu

15、

CUA evaluates the efficiency of the project through comparing the cost of obtaining each quality adjusted life year ( QALY).

在成本&效用分析中,通过比较项目获得每单位调整质量生命年(QALY)所消耗的成本,来对项目效率作出评价。

互联网摘选

16、

The management of the engineering cost is an important part of construction plan, and the control and management system of the project budget ( and final account) with computer is very significant.

工程造价管理是工程建设事业的重要组成部分,采用计算机对其预(决)算系统进行控制和管理具有重要意义。

互联网摘选

17、

According to the characteristics of offshore construction projects and based on common management flow, this paper analyzes four major contents of the cost control of offshore construction project, i. e. design control, procurement control, construction control and final account control.

文章针对海工建设项目的特点,从海工建设项目管理的一般流程出发,分析了海工建设项目成本控制的四项重点内容,即设计控制、采办控制、制造施工控制、结算控制。

互联网摘选

18、

Cost Project is a modern cost management model which is established in a sense of system project.

成本工程是从系统工程的角度构建的一种现代成本管理模式。

互联网摘选

19、

According to theory and practice, through checking contract clauses, concealing acceptance record, design change visa, project quantity, unit price and cost, the examination of project completion final estimate can be finished in a fair, just, reasonable and fast way.

通过对工程竣工结算审查中审核合同条款、隐蔽验收记录、设计变更签证、工程量、单价、取费等几个方面的研究,探索出了公平、公正、合理和快捷做好工程竣工结算审查的方法。

互联网摘选

20、

Or is China still at heart a growth-at-all-costs vandal, ready to choke its rivers with vast mega-projects and allow industrial pollution devastating enough to poison its water, food and air?

还是说本质上中国依然是一个不顾一切代价保增长的环境破坏者,放任河流被大型项目阻塞,水、食物和空气被严重的工业污染毒化?

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈