1、

Temperature Stress Analysis of an Overlength Basement Concrete Structure

超长地下室混凝土结构温度应力分析

互联网摘选

2、

A new method of calculating stable bearing capacity for overlength piles

超长桩稳定承载力计算新方法

互联网摘选

3、

overlength isolated working face reduces the superposed influence of two sides abutment pressure on isolated working face.

超长孤岛工作面减小孤岛工作面侧向支承压力的叠加影响。

互联网摘选

4、

gray optimizing - markov predicating model on bearing capacity of overlength piles

超长桩承载力的灰色优化-马尔柯夫预测模型

互联网摘选

5、

analysis of temperature effect of overlength concrete slab and its analog computation

超长混凝土楼板温度作用效应分析与模拟计算

互联网摘选

6、

effect examination for a base post-grouted overlength drilling pile

超长钻孔灌注桩桩端后压浆效果检测

互联网摘选

7、

study on load transfer law of overlength piles considering depth effect

考虑深度效应的超长单桩荷载传递性状的研究

互联网摘选

8、

construction technique of drilled pile with slurry paneling and overlength impact

泥浆护壁超长冲击钻孔桩施工技术

互联网摘选

9、

test study and finite element analysis of bearing behavior of large diameter overlength piles after grouting

大直径超长桩压浆后承载性能的试验研究及有限元分析

互联网摘选

10、

treatment of severe tibia syntripsis by overlength fibular transplantation with vascular anastomosis

吻合血管超长腓骨移植治疗胫骨严重粉碎性骨折

互联网摘选

11、

adopting reasonable measures to control overlength cracks in buildings

采用合理方法控制超长混凝土建筑物裂缝

互联网摘选

12、

numerical simulation of behavior of overlength piles with different base stratum

不同桩底地层超长桩工作性能的数值模拟

互联网摘选

13、

discussion on design experience of overlength building

超长建筑设计经验浅谈

互联网摘选

14、

overlength coil spacing induction logging

超长线圈距感应测井

互联网摘选

15、

application of overlength bored piles to large-sized thermal power plant

超长灌注桩在大型火电厂中的应用

互联网摘选

16、

standard test method for overlength fiber content of man-made staple fiber

人造短纤维中超长纤维含量的标准试验方法

互联网摘选

17、

load transfer performance of overlength piles

超长桩荷载传递性状研究

互联网摘选

18、

test method for overlength fiber content of man-made staple fiber

人造短纤维中超长纤维含量的试验方法

互联网摘选

19、

the analyses for tbm selection of one 42 km overlength water diversion tunnel in northwest

西北某42km超长输水隧洞掘进机选型分析

互联网摘选

20、

Overlength isolated working face reduces the superposed influence of abutment pressure on isolated working face.

超长孤岛工作面减小孤岛工作面侧向支承压力的迭加影响.

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈