1、

Finally gives Lantsang Hydropower Planning centralized control center and design of the overall program.

最终给出澜沧江梯级电站集控中心的整体规划设计方案.

互联网摘选

2、

The diversion planning is one of the key taches that run through the designing, construction, even running of Water resources and hydropower engineering.

水利水电施工导流规划是贯穿水利水电设计、施工乃至运行的关键环节之一。

互联网摘选

3、

Water diversion and storage planning design for Shangcheng Hydropower plant in Hezhou

贺州市上程水电站工程引蓄水规划设计

互联网摘选

4、

to launch the argumentation for hydropower cascade development planning of the upper reaches of the yellow river.

湿地保护和上游水电梯级开发规划论证等工作。

互联网摘选

5、

planning of sichuan-chongqing power grid and cascade development of jinping hydropower station

川渝电网规划与锦屏水电站梯级开发

互联网摘选

7、

the realization technique and method of visualization dynamic information management system of hydropower project based on internet are analyzed. they include system working model, system planning and design ideology, system structure, technique support, and implementation technique.

分析了基于Internet的水电工程可视化动态信息管理系统的实现技术和方法,包括系统工作模型、系统规划、设计思想、体系结构、技术支持及实现技术等。

互联网摘选

8、

River water flow control and construction program planning of concrete-face rock fill dam for TSQ-ⅰ Hydropower Project

天生桥一级水电站河道水流控制与面板堆石坝施工程序规划

互联网摘选

9、

This is a new probe in the field of planning and design on the office and living quarter for construction and management of hydropower projects.

这是在水电工程建设管理办公生活区规划设计上进行的新的探索。

互联网摘选

10、

interbasin water transfer planning of major-high-head hydropower station in zhejiang province

浙江省高水头骨干电站跨流域引水补源的规划实践

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈