1、

Combined with the theory of process control, the total quality process control in the hydroelectric machine-electric engineering project is highlighted.

并结合过程控制理论,探讨了水电机电工程项目实施阶段的质量过程控制。

互联网摘选

2、
3、

Discussion of Low Tender Price and Claim Problems in Hydraulic and Hydroelectric Projects

刍议水利水电工程低价中标与索赔问题

互联网摘选

4、

Lu Qiang, Sun Yuanzhang et al. Decentralized Nonlinear Optimal Excitation Control. 1996, 11 ( 4), 1957-1962. Technical code for design of automation of hydroelectric power projects

卢强等。分散非线性最优励磁控制及工业装置设计。水电厂自动化,1998(2)。水力发电厂自动化设计技术规范

互联网摘选

5、

WHOLE STRUCTURAL DYNAMIC ANALYSIS OF HYDROELECTRIC PLANT WITH THROUGH-FLOW TURBINE Arrangement of the power house, foundation treatment, structure analysis of power house for tubular turbine unit, design of flood protection during construction and the size of concrete layers and blocks have been introduced in this paper.

贯流式机组水电站厂房整体结构动力分析介绍水电站贯流式机组厂房的布置、基础处理、厂房结构分析、施工期厂房渡汛设计和混凝土分层分块等问题。

互联网摘选

6、

In the hydroelectric generating set, the thrust bearing under huge axis push is one of the key components which determine whether the unit can be operating safely and reliably.

水轮发电机组中,承受巨大轴向推力的推力轴承,是机组能否安全可靠运行的关键部件之一。

互联网摘选

7、

The axial thrust is an important indicator for design and safety consideration in hydroelectric power stations using Kaplan turbines.

安装Kaplan水轮机的低水头水电站,轴向水推力是一个重要的设计和安全运行指标。

互联网摘选

8、

Time optimal control of load adjustment for hydroelectric generator set operating in large power network

在大电网中并列运行的水轮发电机组有功功率最优时间控制

互联网摘选

9、

After more-than-one-year preparation, X Hydroelectric Development Co., Ltd ( briefly called XHDC) was launched officially in September, 2004, and it put into production after getting the privilege to develop water resources along a branch of the Dadu River.

为抓住这一机遇,经过一年多的筹备,X水电开发有限责任公司在2004年9月正式注册成立,购买了大渡河一条支流流域的水资源开发权进行水电开发。

互联网摘选

10、

Application of visual technology in thermal deformation and stress analysis of hydroelectric generator

可视化技术在水轮发电机热变形及热应力分析计算中的应用

互联网摘选

11、

The author also puts forward the project design for a small hydroelectric power station to adopt thrifluoromethane fire protection system in this article.

分析结果表明,小型水电站适宜采用三氟甲烷灭火系统,并对某小型水电站发电机组采用三氟甲烷灭火系统进行了工程设计。

互联网摘选

12、

The paper expounds the key part of the hydroelectric power station simulation system-how to design the simulation system of water turbine actiyator, including the use of system, design principle, design scheme, design method, the optimization and analysis of system.

本文阐述了水电厂运行仿真机中的关键部分&水轮机调速器运行仿真系统的设计问题,包括系统的用途及功能、设计原则、设计方案、设计方法、系统的优化与分析等。

互联网摘选

13、

Development of FS wear-proof coating and its application in hydraulic and hydroelectric engineering

FS型抗冲耐磨涂料的研制及其在水利水电工程中的应用

互联网摘选

14、

The Exploitation of Hydroelectric Resources in Nu River and the Sustainable Development of Minority Area

怒江水能资源开发与民族地区可持续发展

互联网摘选

15、

The Design Standard Problems of Hun River Cascade Hydroelectric Generating Stations

浑江梯级水电站设计标准问题

互联网摘选

16、

On Effect Investigation of Rock Slope Stabilization Causing by Discharge Atomization of Hydroelectric Station

水电站泄流雾化雨对岩质边坡稳定性影响的研究

互联网摘选

17、

Therefore, we should pay attention to the position of development of small hydroelectric power, establishing guideline scientifically and policy according with practice, which can go the health track of "development of small hydroelectric power orderly on the basis of protecting ecology".

为此,必须正确认识小水电开发的形势,科学确立开发方针,制定符合实际的政策措施,使之真正走上在保护生态的基础上有序开发的健康轨道。

互联网摘选

18、

Stablization of the deformable soil mass in a hydroelectric station is taken as an example to illustrate the successful application of light well point system for slide prevention.

以某水电站右出口明渠土质变形体为例,介绍应用轻型井点降水措施与其它配套措施一起实施,在其抗滑治理中取得成功,可为其它类似工程提供借鉴。

互联网摘选

19、

Analysis and assessment on the stability of non-excavated slope with inverted creeping rock mass for Longtan Hydroelectric Project

龙滩水电站蠕变岩体非开挖区边坡稳定性分析与评价

互联网摘选

20、

Guiyang Institute uses geophysical detection method to detect the construction quality of anchor pole in a hydroelectric engineering, that is determined by known anchor pole test, unknown anchor pole check-out to qualified practical engineering anchor pole check-out.

贵阳勘测设计院工程物探测试分院利用物探检测方法对某水电站工程锚杆施工质量进行检测,是通过已知模拟锚杆测试、未知模拟锚杆考核到实际工程锚杆考核合格后确定的。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈