1、

Vertical Itemized Back Pretreatment Medium-length Hole Throwing Blasting Spacing Cementation Filling Mining Method

竖分条预控顶中深孔抛掷爆破间隔胶结充填采矿法

互联网摘选

2、

There's a hole in the back of the cup. Use a sharp knife or some scissors to cut a hole in one side of the cup, near the base. It needs to be big enough for you to be able to fit a thumb in it.

杯子的后面有个洞,用刀子或者剪刀在杯子靠近底部的位置挖出一个洞,拇指适宜大小,这样你就能在不被别人看到的情况下用拇指控制杯子。

互联网摘选

3、

An anti-skidding lattice pattern on the back of the basalt board was designed and a hole was kept to rivet by bolt. Therefore, bonding reliability was increased between the casting basalt scaleboard and the grouting stuff, using CGM stuff to adhibit basalt scaleboard in building operation.

设计铸石板结构为防滑形并预留孔用螺栓锚固,增加了铸石板与底部灌浆料粘接的可靠性,采用CGM自流型灌浆料施工,工期仅为4天。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈