1、

Abstract The physical mechanical properties, manufacture technology, construction technology, durability test of large radiation cross linking special anticorrosive material and its application in project are introduced.

介绍大型辐射交联高分子特种防腐材料的物理力学性能、研制工艺、施工工艺、耐久性试验及工程应用。

互联网摘选

2、

Construction Technology of Arc Formwork in Sri Lanka Water Tower Project

斯里兰卡某水塔工程圆弧模板施工技术

互联网摘选

3、

The project schedule control about the theory of the efficient use of the engineering construction, better able to guide the engineering progress schedule, ensure that the project can be completed on time.

通过将项目进度控制有关的理论高效地运用到工程建设中去,能够较好地指导工程进度的进度,确保工期能够的准时完成。

互联网摘选

4、

The SG-III Laser driver facility now under construction is a significant project in China, it is used to start thermonuclear reaction by generating high power laser beams under laboratory conditions.

神光III激光装置是我国在建的一项重大的工程项目,其作用是在实验室条件下产生高能量激光,从而驱动热核聚变。

互联网摘选

5、

Heat supply and thermotechnical calculation for water project winter construction

水利工程冬季施工供热及热工计算

互联网摘选

6、

Combining the construction of raft foundation in CCTV new site project main building, authors introduce the manufacture technology of steel column with high strength, super thick steel plate and complicated section.

该文结合中央电视台新台址工程介绍了主楼筏板阶段钢结构制作中高强、超厚钢板、复杂截面钢柱的制作工艺。

互联网摘选

8、

The construction term: the project is128 kilometres away from Shawan train station and67 kilometres away from Xinshi port in Yibin city.

建设条件:项目地距乐山市沙湾火车站128公里,距宜宾市新市港口67公里。

provided by jukuu

9、

Due to uninterrupted large flow, the traffic organization and construction site management was the key points which effect whether the extension project can succeed or not.

由于是在大流量且不中断交通条件下进行工程建设,交通组织和施工现场管理成为扩建工程成败的关键。

互联网摘选

10、

The determination of the mix design process and construction mix proportion is presented for Qilinguan ⅰ hydropower project with a double curvature thin arch dam.

介绍麒麟观一级电站工程双曲拱坝碾压混凝土配合比设计过程和施工配合比的确定。

互联网摘选

11、

Practice on the Third Phase Construction and Management of Three Gorges Project

长江三峡水利枢纽三期工程建设管理实践

互联网摘选

12、

Through a supervision case of a cross-river tunnel project hoisting construction in Shanghai, the key points of hoisting plan are summarized.

结合对上海某越江隧道工程起重吊装施工的监理实践,总结了吊装方案的编写要点。

互联网摘选

13、

This article offers some suggestions on several problems, occurred after the start up of Xishuangbanna Natural Forest Protection Project, which are harmful to the Project construction through survey and analysis.

通过西双版纳天然林保护工程启动后的调查分析,就启动后不利于项目建设存在的几个问题,提出建议。

互联网摘选

15、

In this paper, how to effectively control building cost under the current situation is discussed, due to that the engineers take part into project management only in the stage of construction.

就现行建筑市场中,监理工程师在实施阶段才介入项目管理的情况下如何有效进行造价控制进行了探讨。并以某项目为例指出监理工程师在造价控制工作中应该注意的问题。

互联网摘选

16、

New construction technology of a water conservancy and control complex building project

水利调度综合楼结构施工新技术

互联网摘选

17、

In seawall construction and project design, the design maximum tide level is calculated based on the hypothesis that annual maximum high tide level is a stochastic variable which follows a certain distribution.

在海塘建设和工程设计中,将年最高潮位系列视为服从某一确定分布的随机变量,并以此为基础为海塘等工程建设提供设计参数。

互联网摘选

18、

Through adjusting the project during the stages of design and construction, the model distributes the risk of effect on environment to each step of construction reasonably and keeps the technical measures of each step with clear environmental control object.

该模型通过方案设计与施工两个阶段的优化调整,预先将环境影响的风险因素合理地分配到施工的每一步,使每一步的施工技术措施都具有明确的环境控制目标;

互联网摘选

19、

This text through the study of management at preparatory stages of project under construction to engineering, construct course and the time of completion, Have systematically explained the management of the whole course of project under construction of engineering.

本文通过对工程建设施工项目准备期、施工过程及竣工期的管理进行研究,系统地阐述了工程建设施工项目全过程的管理。

互联网摘选

20、

At the time of project completion, the project manager department shall provide the construction works guarantee notice to users for the future timely feedback of quality problem after use and explain the maintenance and use precautions of equipment and building.

项目竣工时,项目经理部向业主提供《建设工程保修通知书》以备用户在使用中发现质量问题及时反馈,并向业主说明设备、建筑物的维护和使用注意事项。

provided by jukuu