1、

Construction quality evaluation on large base slab concrete

大型承台混凝土工程质量评价

互联网摘选

2、

Stress state analysis of the structure of piles, soil and base slab under wave loads

桩-土-承台结构在波浪力作用下的力学效应分析

互联网摘选

3、

Temperature Control Measure in Course of Constructing Mass Concrete Base Slab

大体积混凝土承台施工过程中的温控措施

互联网摘选

4、

Construction of Mass Concrete Base Slab Big and Good Matter

大体积混凝土底板施工

互联网摘选

5、

The Optimum Design of Reinforced Concrete Base Slab of Water Gate

钢筋混凝土闸底板优化设计

互联网摘选

6、

A Study on the Base Slab's Moment of Single Foundation under Column

柱下独立基础底板弯矩计算探讨

互联网摘选

7、

Study on settlement of composite foundation under rigid or flexible base slab

不同刚度基础下复合地基沉降变形性状研究

互联网摘选

8、

Study on Integrated Control Technology of Concrete Cracks in Large-bulk Base Slab

超大体积承台混凝土裂缝综合控制技术研究

互联网摘选

9、

Experimental study on the crack resistance property of elastic base slab made up of steel fiber concrete

弹性地基钢纤维混凝土板抗裂性能试验研究

互联网摘选

10、

Application of FWD in Void Detection for Cement Concrete Pavement Base Slab

FWD在水泥砼路面板底脱空判定中的应用

互联网摘选

11、

Bulk concrete construction control in base slab of East cable support tower of Baling River Bridge

坝陵河大桥东索塔承台大体积混凝土施工控制

互联网摘选

12、

Construction Techniques of Massive Concrete for the Base Slab of the Main Tower of Haihe Bridge

海河大桥主塔承台大体积混凝土施工技术

互联网摘选

13、

Research on new technology for controlling crack in the foundation base slab of mass concrete in certain stupa

某佛塔基础底板大体积混凝土裂缝控制新技术研究

互联网摘选

14、

Measures for Controlling Cracks of No. 5 Base Slab of Badong Yangtze River Bridge

巴东长江大桥5号承台控制裂缝的措施

互联网摘选

15、

Simple Approximate Calculation of Base Slab's Moment for One-way Eccentric Rectangular Spread Foundation Under Column

柱下单向偏心矩形扩展基础底板弯矩简化算法

互联网摘选

16、
17、

Design and construction of wellpoint precipitation on main tower base slab of Songhua River cable-stayed bridge

松花江斜拉桥主塔承台井点降水的设计与施工

互联网摘选

18、

Effects of pipe cooling on thermal stresses in the ship lock concrete base slab in the Changjiang Gorges

水管冷却对三峡船闸混凝土底板温度应力的影响

互联网摘选

19、

The Base Slab Construction of 9# King Tower of the Songhuajiang Stayed Cable Bridge in Harbin

哈尔滨松花江斜拉大桥9主塔承台施工

互联网摘选

20、

In order to improve the conventional method for determine thickness of base slab of the water gate, the auther has devised a optimun design process with computer programme.

闸底板优化设计为了改变过去一贯凭经验确定闸底板厚度的方法,本文以自编程序通过电算对闸底板进行优化设计,从而经济合理地确定闸底板的厚度。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈