- 重点词汇
- 相关例句
After cost evaluation only 20 % of the concrete shell could be covered with the metal sheets.
成本评估后只有20%的混凝土壳体可涵盖的金属板.
互联网摘选
The total amount of this credIt'shall be restored automatically after date of negotiation.
本信用证项下总金额,于每次议付后主动循环.
互联网摘选