Daya Bay Nuclear Power Station equipment reliability management system innovation

  • 大亚湾核电站设备可靠性管理体系创新
  • 来源:互联网摘选更新时间:2026-07-02 10:25:28

  • 重点词汇
  • stationn.火车站; 公共汽车站; 长途汽车站; 站; 所; 局;驻地;地位;身份
  • equipmentn.设备;配备;
  • innovationn.改革,创新;新观念;新发明;新设施;
  • daya[地名] [尼日利亚] 达亚;
  • powern.权力;能力;操纵力;职权;政权;体力;强国;实力;影响力;动力;能量;电力供应;幂;放大率;势力;
  • nuclearadj.原子核的,原子能的;[细胞]细胞核的;
  • management system[计] 管理系统;
  • reliabilityn.可靠,可信赖;
  • bayn.湾;隔间;(建筑物)凸出部分;栗色马;月桂;
  • 相关例句
1、

Practice and experience of radiation protection and optimization ( alara) management system in Daya Bay NPP during the past 10 years

大亚湾核电站辐射防护和最优化(ALARA)管理体系十年的实践和经验

互联网摘选

2、

The development of KPS functions of KIT/ KPS system upgrading transformation in Daya Bay Nuclear Power Plant

大亚湾核电站KIT/KPS系统升级改造中的KPS功能开发

互联网摘选

3、

Design Scheme of 400 kV Line Protection Reconstruction by Daya Bay Nuclear Power Station

大亚湾核电站400kV线路保护改造设计方案

互联网摘选

4、

The function, principle and the maintenance situation of the main equipment ( chiller units) of nuclear island chilled water system at Daya Bay nuclear power plant were presented.

介绍了大亚湾核电站核岛冷水系统(DEG)的主要核心设备-制冷机组的功能原理及其维修情况;

互联网摘选

5、

Scram Reduction Strategy and Good Practices in Daya Bay NPP

大亚湾核电站减少非计划停堆停机策略与实践

互联网摘选

6、

The Daya Bay Nuclear Power Plant tried to work in the principle of RCM in 1998. In 2004, RCM work had been in the five-year plan of the plant.

电力行业中,1998年,大亚湾核电站开始应用RCM,2004年RCM工作列入5年发展规划。

互联网摘选

7、

Localized Transformation of RIC System in Daya Bay Nuclear Power Station

大亚湾核电站堆芯参数测量系统的国产化改造

互联网摘选

8、

Safety Management and Operation Achievements of Daya Bay Nuclear Power Plant

大亚湾核电站安全管理及运行业绩

互联网摘选

9、

Concentrations of Nuclide~ ( 110m) Ag in Marine Samples around Daya Bay Nuclear Power Station

大亚湾核电站周围海域海洋环境介质中~(110m)Ag含量

互联网摘选

10、

Analysis of NIS PARs Installation in Daya Bay Nuclear Power Station

大亚湾核电站安装氢气复合器方案计算分析

互联网摘选

11、

Application of GO Methodology in Reliability Analysis of Offsite Power Supply of Daya Bay NPP

大亚湾核电站外电源系统可靠性分析中GO法的应用

互联网摘选

12、

Distributions of Dissolved Heavy Metals in the Typical Backwater Regions of the Three Gorges Reservoir Quality Assessment of the Neighboring Sea Waters Before and After the Operation of the Nuclear Power Station at Daya Bay

三峡水库156m蓄水后典型库湾溶解态重金属分布特征研究大亚湾核电站运转前和运转后邻近海域水质状况评价

互联网摘选

13、

We have successfully executed many building projects for administration, commercial, residential and especially industrial in China.

至今,华海公司成功地承建了许多工程项目,如行政, 商业, 居住和工业建筑等.

互联网摘选

14、

Over the past 18 months, building projects around the country have ground to a halt.

18个月以来, 国内各地的建筑工程一直悄无声息.

互联网摘选

15、

The New Requirement and Development of Nuclear Power Plant Simulator after Three Mile Island Event

核电站模拟器在三里岛事件后的新要求和新发展

互联网摘选

16、

The name Three Mile Island might not sound very familiar to you, but it probably does to your parents and teachers.

三里岛这个名字,你可能不是很熟悉,但是你的父母和老师大概不会对这个名字陌生。

互联网摘选

17、

Since Three Mile Island accident and Chernobyl accident, the problem of safely running of nuclear power plant ( NPP) is more concerned by nuclear energy community.

从三里岛事故和切尔诺贝利事故以来,核动力装置的安全问题一直是核能界关注的重要问题。

互联网摘选

18、

On the base of results existed, the finite element software ANSYS is used to study systematically the mechanism, the effecting factor and applied calculating method of prying action.

本文在已有研究成果上利用有限元程序ANSYS对高强螺栓端板连接这一类节点连接形式的撬力产生机理、影响因素和具体计算方法进行了系统的分析研究。

互联网摘选

19、

Based on stress concentration coefficient, fatigue notch coefficient, fatigue limit and range of allowed stress are obtained.

在K研究工作的基础上,求得相应的疲劳缺口系数K f,进而推定高强螺栓的疲劳极限应力幅及其允许应力幅。

互联网摘选

20、

Fatigue Life Estimation on High-strength Bolt Based on Mechanics of Fracture and Accumulated Damage Theory

基于累积损伤及断裂力学理论的高强螺栓疲劳寿命估算

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈