The incorporate energy dissipation of stepped spillway with flaring gate piers and plunge pool is a new-style dam of hydraulic structure proposed by Chinese engineers and has been used in practical projects, but there is a lack of numerical computation results.

  • 宽尾墩+阶梯溢流坝+消力池一体化的坝面泄流形式是我国科技工作者提出的新型水工设施,已在实际工程中有所应用,但缺少数值计算成果。
  • 来源:互联网摘选更新时间:2026-07-12 21:32:08

  • 重点词汇
  • damn.水坝,堰;水库;(牙科用的)橡皮障;〈比喻〉障碍;
  • incorporatevt.组成公司;包含;使混合;使具体化;
  • energyn.能量;能源;能;精力;活力;力量;干劲;力气;毅力;努力;
  • a lack of缺乏,缺少;
  • resultsn. 后果,结果( result的名词复数 );成绩(包括比分、得票、获胜者或当选者名单等);成功实现的事;
  • there is那儿有;有着;
  • structuren.构造;建筑物;周密安排;
  • hydraulicadj.水力的,水压的;用水发动的;[建]水硬的;水力学的;
  • 相关例句
1、

Analysis on prototype observation on lifting power of spillway tunnel working gate for Tianqiao Hydropower Station

天桥水电站泄洪洞工作闸门启闭力原型观测成果分析

互联网摘选

2、

Automatic Control System of Two-cylinder Hydraulic Pressure Hoist of the Spillway Radial Gate

泄洪大坝弧形闸门双缸液压启闭机自动控制系统

互联网摘选

3、

Problems Encountered in Hydraulic Hoist for Spillway Segment Gate and its Causes

表孔弧门液压启闭机运行问题及其原因分析

互联网摘选

4、

Application of MARC Software in Structure Analysis of Spillway Pre-stressed Gate Piers

MARC软件在溢洪道预应力闸墩结构分析中的运用

互联网摘选

5、

According to the operating of Anti Reservoir spillway gate, results of model experiment and field observation as com-pared with theoretical calculation have been made and got the relation formula between weir overflow and hole overflow.

根据岸堤水库溢洪闸的工程实例,通过模型试验和现场实测对比理论计算得到孔流与堰流的关系式,把堰流的试验结果推广到闸门控制泄流上,取得成功。

互联网摘选

6、

Experiment on weir overflow and hole overflow in spillway gate of Andi Reservoir

岸堤水库溢洪闸堰流&孔流流量的试验分析

互联网摘选

7、

Study on Discharge Coefficient for Steady Free Outflow under a High Dam Spillway Gate

高坝平板闸门闸孔恒定自由出流流量系数研究

互联网摘选

8、

Construction Scheme of Blast Engineering of a Flood Spillway Gate Urge

某溢洪道闸墩爆破拆除工程施工方案

互联网摘选

9、

A Study on Theory of Dynamic Tracking Control of Spillway Gate

泄洪闸门动态跟踪控制理论研究

互联网摘选

10、

Large-scale model tests were performed to study the effectivity of many methods of aeration in cavitation-protection for the sidewalls, and the plan was given for spillway tunnel with large discharge and high velocity flow.

通过大比尺的模型试验,研究了多种掺气减蚀方法,提出了解决高流速、大流量泄洪洞侧墙掺气减蚀方案。

互联网摘选

11、

One of the main problems of spillway tunnel with large discharge and high velocity flow is the cavitation damage.

高水头、大流量泄洪洞内高速水流问题主要问题之一是水流空化引起过流表面空蚀。

互联网摘选

12、
13、

Stability Analysis of Ogee Section at the End of Discharge Trough of Spillway of Earth-rock Dam on Deep Soft Foundation

深厚软基上土石坝坝体溢洪道泄槽末端反弧段的稳定分析

互联网摘选

14、

Study of Roof Deformed Features on Top of the Mined Area Within Slope Outside Intermediate Section of Spillway in Some Dam

某坝区溢洪道中段外侧边坡采空区上覆岩体变形特征研究

互联网摘选

15、

Study on Stress of Intake Head in Ski-jump Spillway of Arch Dam

拱坝滑雪道式溢洪道进口闸首的应力研究

互联网摘选

16、

A Preliminary Study on Stepped Spillway on RCC Dam for Dissipation

碾压混凝土坝采用台阶式溢洪道消能初探

互联网摘选

17、

Though optimization of broad of spillway and dam height of silt dam, their optimum combination was found;

通过对溢洪道宽度和淤地坝坝高的优选,找到了二者的最佳组合;

互联网摘选

18、
19、

The experimental study is conducted to show the effects of silt releasing sluice and energy dissipating downstream of spillway dam section, diverting water to prevent sedimentation, and the flow pattern at the inlet section of diversion tunnel.

通过模型试验,对甘肃省金昌市引硫济金枢纽工程的泄洪冲沙闸和溢流坝下游消能防冲效果、引水防沙效果及引水隧洞进口段水流流态进行了试验和研究。

互联网摘选

20、

Roller compacted concrete ( RCC) will be used in section No.6-No.15 of the spillway dam, section No.5 of the non-overflow dam near the left side bank and the left guide wall of Wan'an Project.

万安水电站二期主体工程溢流坝6~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。

互联网摘选

  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈